Boiler Electrical - Sime Murelle EV HE 30 Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.7

BOILER ELECTRICAL

ENG
FR
KEY
L
Phase
N
Neutral
F
1-2 Fuse (4 AT)
T
RA Ignition transformer
P
I C.H. pump
V
Fan
EA
Ignition electrode
ER
Sensing electrode
EV
1-2 Gas valve 1-2
TS
Safety stat
SF
Smoke sensor
PA
Air pressure switch
VD
Shunt valve
SM
C.H. sensor
- IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED IT MUST BE REPLACED WITH TYPE 18 AWG
WIRE OR ITS EQUIVALENT.
- WHEN CONNECTING FIELD WIRING TO THE BOILER WIRING MATERIAL HAVING A MINIMUM SIZE OF 18 AWG AND A TEMPERATURE
RATING OF A LEAST 221°F (105°C) SHALL BE USED.
- CAUTION: LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND
DANGEROUS OPERATION.
- VERIFY PROPER OPERATION AFTER SERVICING.
28
FL
Flow water switch
SS
D.H.W. temperature sensor
TPA
Water pressure transducer
FLM
Fluxmeter
TR
Transformer 120/24
CONNECTION DIAGRAM
AR
Remote alarm
VZ
Zone valve
AUX
Auxiliary connection
TA1
Room stat 1 (optional)
TA2
Room stat 2 (optional)
SE
External sensor (optional)
ST
Solar heat sensor
COLOR WIRES
BK
Black
BR
Brown
R
Red
O
Orange
Y
Yellow
G
Green
BL
Blue
W
White
NOTE: Connect TA1 to the clamps 7-8
after having removed the bridge.
Fig. 11

Publicité

Chapitres

Table des Matières
loading

Table des Matières