Sime Murelle EV HE 30 Instructions D'installation Et D'utilisation page 22

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Joint procedure
ENG
(see figure 6 )
FR
The female end of each Z-Vent III component
incorporates a silicone sealing gasket.
Examine all components to insure that
gasket integrity has remained during ship-
22
ping. Gaskets must be in the proper position
or flue gases could leak resulting in carbon
monoxide poisoning.
1. Align pipes and push them together as
far as they will go (to indent or at least
1.75 inches).
2. Tighten gear clamp to a minimum tor-
que of 40 in/lbs. and a maximum of 50
in/lbs.
NOTE: Some flue collars may require the
use of high temperature silicone sealant to
make a positive pressure gas tight seal.

Publicité

Chapitres

Table des Matières
loading

Table des Matières