Power Supply Configuration - Lutron GRAFIK 7000 Guide D'installation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Power Supply Configuration

GRAFIK 7000P processor only
The power supply modules must be properly configured for communicating with either lighting zone
controllers (LZCs) or control station devices (CSDs) on each link. Use the table below to find the row for
each link used in your system, and confirm that the proper color wire is connected to the proper
terminal on the corresponding power supply for your link type.
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
H H
H H
H H
H H
H H
H H
N N
N N
N N
H H
H H
0 0
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
N N
N N
N N
N N
N N
N N
I I
Processor Panel
(GRAFIK 7000P only)
Link
Power Supply #
A (yellow wire)
B (red wire)
C (blue wire)
D (yellow wire)
E (red wire)
F (blue wire)
Notes
• Processor panels generally come properly
wired from the factory for CSD and LZC links; if
field adjustment is required, follow the diagram
above
Power Supply 2
To
main board
DO NOT
MODIFY
Power Supply 1
To
main board
DO NOT
MODIFY
To Connect CSDs to Link
1
Use terminal 7
1
Use terminal 6
1
Use terminal 5
2
Use terminal 7
2
Use terminal 6
2
Use terminal 5
R
CSD
LZC
8
7
6
5
4
3
2
Blue link: F is LZC
Red link: E is LZC
Yellow link: D is LZC
DO NOT MODIFY
Blue link: F is CSD
Red link: E is CSD
Yellow link: D is CSD
DO NOT MODIFY
CSD
LZC
8
7
6
5
4
3
2
Blue link: C is LZC
Red link: B is LZC
Yellow link: A is LZC
DO NOT MODIFY
Blue link: C is CSD
Red link: B is CSD
Yellow link: A is CSD
DO NOT MODIFY
• Do not modify the connections to the MB
terminals
• Unused or undefined links should be
connected to the CSD connector
Installation of GRAFIK 5000/6000/7000 System
1
1
To Connect LZCs to Link
Use terminal 3
Use terminal 2
Use terminal 1
Use terminal 3
Use terminal 2
Use terminal 1
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grafik 6000Grafik 5000Grafik 7000pGrafik 6000pGrafik 5000p

Table des Matières