Lutron GRAFIK 7000 Guide D'installation Et De Maintenance page 30

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Appendix: Using the GRAFIK7000 Processor with
Emergency Systems (continued)
Scenario 3: Multi-Processor System with Lighting Zone Controller (LZC) Zones
1. Set Normal/Emergency switch in all processor panels to the Emergency/Essential position.
2. Wire each processor's PP link terminal 1 (COM) and 2 (Sense) together.
3. In one processor panel, connect a normally closed (NC) switch between IP link terminal 2 (+33 V IP)
and PP link terminal 2 (Sense).
4. All LZCs on all panels will go to their emergency light level when switch S1 is opened, or when power
is lost to the processor where switch S1 is connected.
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
H H
H H
H H
H H
H H
H H
N N
N N
N N
0 0
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
N N
N N
N N
N N
N N
N N
I I
PP link
30 Installation of GRAFIK 5000/6000/7000 System
Emergency/Normal
selector switch
H H
H H
set to
Emergency/
Essential
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
H H
H H
H H
H H
H H
H H
N N
N N
N N
H H
H H
0 0
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
N N
N N
N N
N N
N N
N N
I I
PP link
Switch Settings
Normal/
Ignored
Non-Essential
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
H H
H H
H H
H H
H H
H H
0 0
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
N N
N N
N N
N N
N N
N N
I I
IP link
PP link
S1:
Emergency
switch
Emergency/
Essential
N N
N N
N N
H H
H H
R

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grafik 6000Grafik 5000Grafik 7000pGrafik 6000pGrafik 5000p

Table des Matières