Activate System - Lutron GRAFIK 7000 Guide D'installation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Activate System

Once all links are installed and wiring is verified, turn the Processor Panel power switch ON (rotate
clockwise to the position marked 1). After 10 seconds, compare the diagnostic LEDs shown below to
those listed in the Troubleshooting Guide.
Links A-F
1
2
3
UI Link
1
2
3
Note
Your processor panel may have been
pre-programmed at the factory for
operation with your system. If all wiring
has been successfully completed,
control station devices should be able to
control loads that are not wired in
bypass.
R
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
H H
H H
H H
H H
H H
H H
T1 T1
T2 T2
T3 T3
T4 T4
T5 T5
T6 T6
N N
N N
N N
N N
N N
N N
4
D
(Link LEDs shown on
4
D
bottom edge of processor
next to each connector)
GRAFIK 7000P with six CSD links
You have completed your GRAFIK5000, 6000, or 7000
system installation. For Onsite Factory Commissioning, call
Lutron Technical Support and select Startup to schedule a
field service visit. Allow for 10 working days between day
of call and scheduled visit.
In the U.S., Canada, and the Caribbean: 1.800.523.9466
In Mexico: 888.235.2910
In Europe: +44.207.702.0657
In Asia: +65.6220.4666
In Japan: +81.355.758.411
In all other countries: +1.610.282.6701
Power switch
N N
N N
N N
H H
H H
0 0
I I
CSD1
shown
Installation of GRAFIK 5000/6000/7000 System
Power Supply Board(s)
CSD2
CSD3
EMER/
PWR
PWR
PWR
OVER
OK
OK
OK
RIDE
IP link
Ethernet
PP Link
1
2
3
4
D
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grafik 6000Grafik 5000Grafik 7000pGrafik 6000pGrafik 5000p

Table des Matières