Selecting The File Format; Downloading All Reports; Downloading By Commission Number, Date Or Report Range; Understanding The Report Download Process - Hürner HST 300 GeoTherm+ 2.0 Manuel Utilisateur

Masquer les pouces Voir aussi pour HST 300 GeoTherm+ 2.0:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

H Ü R N E R S c h w e i s s t e c h n i k G m b H
Nieder-Ohmener Str. 26
35325 Mücke, Germany
The interface port complies with the USB version 2.0 specification (i.e.,
maximum data rate of 480 megabits per second).
Before transferring data, it is highly recommended to switch
the welding unit off and on again. If this fails to happens,
there is a risk of data transfer failure, or reports in the weld-
Important
ing unit may be corrupted.
When transferring welding reports to a USB stick, always
be sure to wait until the display shows the "Download fin-
ished" message before you disconnect the USB stick from
Important
the product. If you disconnect it too early, the unit may ask
you whether you want to delete the reports in memory, al-
though they were not properly transferred. In this case, if
you delete the contents of the report memory, the welding
reports would be irrevocably lost and would not be available
elsewhere either.
7.1

Selecting the File Format

Connecting the storage media causes the the screen to appear in which
the format of the output file with the welding reports can be selected:
a PDF file with an abstracted or extended version of the report or the
format of the welding data management application DataWork. Using
the ñ and ò arrow keys, select the file type you need and confirm
your selection by pressing the START/SET key.
The Service Report option is not important for normal operation. In
the scope of computer-assisted unit service, this report lists the events
related to the maintenance of the welding unit.
7.2

Downloading All Reports

After the file type was selected, the next screen offers a "Print All Re-
ports" option. Selecting it will download all welding reports currently
in system memory in the previously selected file format.
7.3
Downloading by Commission Number, Date or Report
Range
After the file type was selected, the next screen offers a "By Commis-
sion Number," a "By Date Range," and a "By Report Range" options.
Depending on the selection, the ñ and ò arrow keys can be used to
select from the commissions currently in system memory the desired
one, of which the reports should be downloaded, or the ï, ð, ñ, ò
keys can be used (see Info in Sect. 5.2) to enter a start date and an
end date, or the first and the last report, that define a range of dates
or a range of reports of which the reports should be downloaded.
When you press the START/SET key, you cause the selected reports to
be transferred to the storage media.
7.4

Understanding the Report Download Process

The download starts automatically after a selection was made among
the options. Wait for all the selected reports to transfer and the
"Download completed" message to appear on the screen.
If a problem occurs while the download is in progress, a "Not ready"
message shows. After the problem condition is cleared, the download
resumes automatically.
If the welding unit recognizes a problem that cannot be
cleared while the data transfer is in progress, it does not
Info
Version July 2013
HÜRNER HST 300 GeoTherm + 2.0 User's Manual
* Select File Type *
DataWork File
>PDF Abstract
PDF Ext'd Report
Display 8
EN
11

Publicité

Table des Matières
loading

Table des Matières