Preparing For Pumping; Mains Operation; Battery Operation - Medela Swing Mode D'emploi

Masquer les pouces Voir aussi pour Swing:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56

6. Preparing for pumping

Warning
16
16
l re 6.1 Mains operation:
Follow the exact order of the steps.
l Only use the mains adapter supplied
with the Swing.
l Make sure the voltage of the mains
adapter is compatible with the
power source.
i
Info
l re 6.2 Battery operation:
The batteries do not need to be
removed when the main adapter
is used for pumping.
l Regularly check the condition of
the batteries in the motor unit.
l If Swing will remain unused
for a longer period of time, remove
the batteries from the battery
compartment.
l Batteries last for two to three pump-
ing sessions (approx. 1 ½ hours
pumping time).

6.1 Mains operation

1
Plug the mains adapter cord
into the motor unit.

6.2 Battery operation

1
Open the battery compart-
ment on the back in the
direction of the arrow.

Publicité

Table des Matières
loading

Table des Matières