B) RTD (R R R R R esistance T T T T T emperature D D D D D etector)
B) RTD
B) RTD
B) RTD
B) RTD
Type: Pt 100 3 wires connection.
Type
Type
Type
Type
Current: 135 µA.
Current
Current
Current
Current
Line resistance
Line resistance: automatic compensation up to
Line resistance
Line resistance
Line resistance
20 Ω/wire with :
- error <+0.1% of the input span for range -19.9 a
99.9 °C.
- not measurable error for the other ranges.
Engineering units: °C or °F programmable.
Engineering units
Engineering units
Engineering units
Engineering units
Burnout
Burnout
NOTE
NOTE
Burnout
Burnout
Burnout: up scale. NOTE
NOTE: a special test is
NOTE
provided to signal OVERRANGE when input
resistance is less than 15 Ω.
Calibration: according to DIN 43760.
Calibration
Calibration
Calibration
Calibration
STANDARD RANGE TABLE
RTD
RTD
RTD
RTD
RTD
Measuring range
Measuring range
Measuring range
Measuring range
Measuring range
Type
Type
Type
Type
Type
RTD Pt 100
-199 - +500 °C
-199 - +999 °F
RTD Pt 100
-19.9 - +99.9 °C
-----
C) CURRENT TRANSFORMER INPUT
C) CURRENT TRANSFORMER INPUT
C) CURRENT TRANSFORMER INPUT
C) CURRENT TRANSFORMER INPUT
C) CURRENT TRANSFORMER INPUT
Input current: 50 mA AC.
Input current
Input current
Input current
Input current
Read-out
Read-out: selectable among 10, 25, 50 or 100 A.
Read-out
Read-out
Read-out
Resolution
Resolution
Resolution:
Resolution
Resolution
- 0.1 A for 10 A range.
- 1 A for all the other ranges.
Active period
Active period:
Active period
Active period
Active period
- for relay output: NO or NC programmable
- for SSR drive output: logic level 1 or 0
programmable.
Minimum time duration of the
Minimum time duration of the
Minimum time duration of the
active period:
active period
active period
Minimum time duration of the
Minimum time duration of the
active period
active period
50 ms.
CONTROL ACTIONS
CONTROL ACTIONS
CONTROL ACTIONS
CONTROL ACTIONS
CONTROL ACTIONS
Control actions
Control actions: PID + SMART
Control actions
Control actions
Control actions
Proportional band
Proportional band
Proportional band
Proportional band: from 1.0 % (for heating
Proportional band
action) or 1.5 % (for heating and cooling action)
to 99.9 % of the input span.
Setting Pb = 0 an ON/OFF control is performed.
Hysteresis
Hysteresis (for ON/OFF control action): from 0.1
Hysteresis
Hysteresis
Hysteresis
% to 10.0 % of the input span.
Integral time
Integral time
Integral time: from 10 seconds to 20 minutes;
Integral time
Integral time
resolution 10 second. Setting a value upper than
20 minutes the integral action will be excluded.
Derivative time: from 0 to 9' 59''.
Derivative time
Derivative time
Derivative time
Derivative time
Integral preload:
Integral preload:
Integral preload:
Integral preload:
Integral preload:
- from 0 to 100% for one control output.
- from -100 to 100% for two control outputs
Main output cycle time
Main output cycle time
Main output cycle time
Main output cycle time: from 1 to 200 s.
Main output cycle time
Cooling cycle time
Cooling cycle time
Cooling cycle time
Cooling cycle time
Cooling cycle time: from 1 to 200 s
Relative cooling gain
Relative cooling gain
Relative cooling gain
Relative cooling gain: from 0.20 to 1.00
Relative cooling gain
NOTE: the Pb, ti, td and rCG parameter may be
NOTE
NOTE
NOTE
NOTE
limited when the SMART function is enabled.
Overlapping/dead band: from - 20 % to 50 %
Overlapping/dead band
Overlapping/dead band
Overlapping/dead band
Overlapping/dead band
CONTROL OUTPUTS
CONTROL OUTPUTS
CONTROL OUTPUTS
CONTROL OUTPUTS
CONTROL OUTPUTS
Type:
Type:
Type:
Type: time proportioning
Type:
Output updating time: 500 ms.
Output updating time
Output updating time
Output updating time
Output updating time
Output resolution
Output resolution
Output resolution: 1% of the output span.
Output resolution
Output resolution
Action
Action
Action: direct or reverse programmable.
Action
Action
Output power limiter:
Output power limiter
Output power limiter
Output power limiter
Output power limiter
- from 0.0 to 100.0 % for one control output.
- from -100.0 to +100.0% for two control outputs
This function may be operative at instrument power
up for a programmable time (to avoid thermal shock
or to pre-heat the plant).
GB
GB
GB
GB
GB
22