Power Supply Connection; Start - DAB EVOSTA2 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61

16.1 Power supply connection

17. START

All the starting operations must be performed with the cover of the EVOSTA2 SOL control panel closed.
Start the system only when all the electrical and hydraulic connections have been completed.
Avoid running the circulator when there is no water in the system.
As well as being at a high temperature and pressure, the fluid in the system may also be in the form of
steam. DANGER OF SCALDING!
It is dangerous to touch the circulator. DANGER OF SCALDING!
Once all the electrical and hydraulic connections have been made, fill the system with water and if necessary with glycol (for the
maximum glycol percentage see par. 3) and feed the system.
Once the system has been started it is possible to modify the operating modes to adapt better to the plant requirements (see par.12).
ENGLISH
Connect the connector to the pumpa.
Figure 16
53

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Evosta3Evosta2 sol

Table des Matières