4.
INSTALLATION RECOMMENDATIONS
TO OPTIMISE THE EFFICIENCY OF SOLIFLOW'S CONSTITUENT PARTS, PARTICULARLY THE OVER-FLOW, THE UNIT MUST
Concrete structures
Create an opening 500 mm wide and 300 mm high (height measured from the
top of the pool wall) as shown in fig 1.
Check that the front brace and flange are correctly mounted on the Soliflow unit.
Line the top of the brace up with the top of the pool wall to establish the vertical
position.
The horizontal position will be determined by the flange that must be flush with
the pool waterproofing.
The upper reinforced concrete belt should be continuous, thus it should either
pass around or underneath Soliflow.
fig. 2
Thin walls - prefabricated structures
Mount the front brace on Soliflow (a few dots of PVC glue will help).
Line the top of the brace up with the top of the pool structure to esta-
blish the vertical position.
Using the flange as a template, make a cut-out in the structure. Drill
two additional holes for the pre-fix screws (fig 3a).
Position a gasket on the suction mouth and attach Soliflow to the
structure using the pre-fix screws (fig. 3b).
fig. 4
26/40
2020/02 - Indice de révision : H - Code : 26901
IMPORTANT!
BE PERFECTLY LEVEL.
To seal the unit in position, place one board in front of the opening
and another between the wall and Soliflow (fig 2) and hold them in
position using a clamp.
Blocking
Position Soliflow on a supporting concrete base (fig. 4).
The area 40 cm around the Soliflow unit should be back filled with stabilised
sand.
fig. 1
fig. 3a
fig. 3b