SORHEA
Detail of sealing post
Fasten the 4 anchor bolts into a concrete block using the template (provided) to ensure proper
vertical emplacement of the bolts.
Position the sealing post so that it is properly oriented with the beams.
Pay attention to the place where the cables will go though.
The holding wedge inside the package of the pole is used as a sealing template.
=
200 mm (7.9 in)
250 mm (9.8 in)
Mounting the column on the post
1. Mount the M5x30 screws inside the rabbets of the Frame.
2. Mount the spacers at the rear of the column and fix everything on to the pole.
4 anchors
stalks
M16x250
Hole 70 mm
(2.7 in) for
passage of
cable
=
Beam utilization zone:
90°
- 49 -
MAXIRIS 3000 / 3100