Commissioning - Palazzetti WT R/L Série Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6

Commissioning

After positioning the appliance it is necessary to perform the following operations:
1. Open the door.
2. Make sure that the flue inspection valve is in the closed position with the rod positioned in the
appropriate bracket (Fig. 6.1a).
3. Insert in sequence the spacer, deflectors and O
- Fig. 6.1d).
Product images are purely indicative
RING as shown in the diagram (Fig. 6.1b - Fig. 6.1c
2
Fig. 6.1a
Fig. 6.1c
220 mm
004778150 - 18/08/2020
Fig. 6.1b
Fig. 6.1d
33

Publicité

Table des Matières
loading

Table des Matières