4. Check that the new component seals are correctly
55
5. Position the new components on the base plate so that the
6. Retighten both screws.
7. Label the valve position with a name plate R412008887 (56)
8. Set all the manual overrides on all valves to zero position.
9. Check all connections and put the system back into
AVENTICS | CD01-PI | R412012449–BAL–001–AD
positioned.
electrical connection fits into the hole on the base plate.
Tightening torque: 2.5 Nm
on the base plate so that the change can be tracked at
a later date. The valve can be additionally labeled with
a R412011097 sticker on the pilot valve.
operation (see section 7 "Commissioning" on page 79).
Extension and Conversion
87