Commissioning; Connecting To The Proportional Valve - Burkert 8624-2 Standard Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

COMMISSIONING

NOTE
5.1

Connecting to the proportional valve

Fig.: Connecting the flow controller to the proportional valve
➔ Unscrew the 4 screws on the front panel of the flow pressure controller and
remove the cover carefully.
➔ Place the housing of the flow pressure controller with the seal onto the
valve.
➔ Screw the flow pressure controller tightly to the valve.
ATTENTION!
➔ Place the cover on the flow pressure controller and screw it tight with the 4
screws.
ATTENTION!
Interference with the device is only allowed by specialist
personnel using suitable tools!
Before interfering with the flow pressure controller, always
switch off the voltage!
On screwing the flow pressure controller onto the propor-
tional valve, make sure the seal is correctly seated!
Make sure the cover is placed on the right way round
(pinned strips must engage in the sockets).
8624-2 Standard - 9

Publicité

Table des Matières
loading

Table des Matières