Commissioning; Mounting And Set-Ups - Sartorius Stedim Biotech CERTOMAT IS Mode D'emploi

Table des Matières

Publicité

3.3

Commissioning

3.3.1 Mounting and set-ups

1.
If you have changed the mounting place (e. g. cooling
room <-> laboratory) please wait until the device has
warmed up to room temperature before you start it.
Otherwise the air humidity can condensate in the device
and can lead to functional disturbances.
Following the transport of a CERTOMAT® IS with
integrated cooling unit, the device may only be put
into operation after a waiting period of an hour.
This avoids danger to the cooling unit.
Please connect the CERTOMAT ® IS with the mains
2.
cable to a suited socket.
3.
By pressing the mains switch (1) the electronics are
supplied with line voltage.
After switching on the device initializes. After approx.
5 sec. the background illumination of the display as
well as the green operating LED light. The manual
menu „MAN" is active. The device is now ready for
operation.
In pressing the ESC-key you change from the manual
menu to the main menu.
1
Fig. 2: Frontpanel with key pad
1.
mains switch
2.
alphanumeric display
3.
function field [F1-F5]]
4.
[+/-] -key for the set-up of process values (temperature, speed)
5.
[ESC] –key for menu jump back
[ENTER] –key for confirmation of inputs / changes
6.
Operation-LED (green)
7.
[START] -key
8.
ALARM-LED (red)
9.
[STOP] -key
10.
display field MODE
2
3
10
3
4
5
9
8
7
6
9

Publicité

Table des Matières
loading

Table des Matières