TRANSPORT, STORAGE AND HANDLING
The basic balancing machine packaging consists of 1 wooden crate containing:
- the balancing machine;
- the set of accessories;
- the wheel guard and the relative tubular support (C, B, fig. 8).
- Before installation, the balancing machine must be transported in its original packing,
making sure that the machine is maintained in the position indicated on the outer
packing. The machine can be moved by placing the packages on trolley with wheels
or by inserting the forks of a lift truck in the relative channels in the pallet (fig. 1).
- Packaging dimensions:
Length
(mm)
1480
- Ambient conditions in place of storage:
• relative humidity from 20% to 95%;
• temperature from -10° to +60°C.
ATTENTION
Do not place other items on top of the two packs, as this may result in damage.
After installation, the machine can be moved using the following methods:
- with a crane, using special equipment that holds the machine at the lifting points (fig.
2). To do this, insert the two hooks of the lifting equipment in the two holes provided
on the left-hand side of the body (A, fig. 2) and pass the sling underneath the beam
which supports the central unit (right-hand side of the body).
- inserting the forks of a lift truck under the machine so that the centre of the forks
correspond approximately to the centre line of the cabinet (fig. 3).
During these operations make sure that the fork-lift truck is fixed to the body of the
balancing machine by means of the safety screw provided (A, fig.9).
WARNING
Always unplug the power supply lead from the socket before moving the machine.
ATTENTION
Never apply force to the spin shaft when moving the machine.
52
Depth
Height
(mm)
(mm)
860
1400
Weight
Packaging weight
(kg)
330
MT 2450 operator's manual
(kg)
85