Télécharger Imprimer la page

Rivacold RC Serie Instructions D'assemblage page 51

Publicité

Les langues disponibles

Les langues disponibles

ATTENTION:
At any rate, to perform all the maintenance or cleaning interventions reported below near the
following Individual Protection Devices are needed:
5.3 Checking material availability
At least 60 days in advance on the date established for the maintenance interventions, run a detailed examination of the necessary
material:
1.
check if this material is available in stock
2.
if need be, request the missing details to the Technical Office of the Manufacturer at least 30 days in advance.
5.4 Maintenance and cleaning
DANGER :
DANGER :
ATTENTION:
ATTENTION:
5.4.1 Interventions and their frequency
The most significant and important operations relative to ordinary maintenance may be thus summarized:
Check, every four months, that all the terminals inside the shunt box are tightened.
Visually check, every four months, the entire refrigerating circuit (inside too) to search for refrigerant leaks, which are also
announced by traces of lubricating oil. Promptly intervene and examine in depth in case of doubt (if need be, contact the
Technical Assistance of the Manufacturer).
Periodically clean the evaporator to prevent the accumulation of harmful substances. We recommend the use of water and soap,
avoiding solvents, aggressive, abrasive, or ammonia-based agents.
Upon completion of the maintenance, reposition all the protections that have been removed (guarding and grids; see
Figure
10).
5.5 Disassembly and demolition
To perform the disassembly and demolition operations, the following Individual Protection Devices are necessary:
5.5.1 Disassembly
ln the case that it proves necessary to disassemble the
1.
Insulate the
PARTLY COMPLETED MACHINERY
2.
Referring to Paragraph 4.5 – Dis-installation in Chapter 4 - Transport and Installation, proceed to dis-install the
; moreover, contact the Technical Offices of the Manufacturer to obtain the necessary assistance during this
MACHINERY
intervention.
to dispose of materials with a high environmental impact, if necessary, contact specialized waste collection
centers.
the Manufacturer rejects any responsibility for any possible damages to things and/or persons
stemming from an improper or incomplete maintenance.
before performing all the ordinary maintenance interventions foreseen, make sure that the
electrical power supply to the
surfaces to cool down.
in case components of the
identical to the original.
any possible braze welding on the products with risk class PED ≥ 1 must be performed by qualified
personnel.
PARTLY COMPLETED MACHINERY
from the electrical power supply.
PARTLY COMPLETED MACHINERY
are replaced, they must be replaced with ones
PARTLY COMPLETED MACHINERY
, perform the procedure indicated below.
PARTLY COMPLETED MACHINERY
is cut-off; moreover, wait for the hot
PARTLY COMPLETED
RC-RCS Pag - 51 - REV 02 03/16
UK
, the
Chapter 8,

Publicité

loading