Do not for any reason whatsoever lift the various parts of the
elements (e.g. wires or sheaths).
Make sure there are no persons near the area where the lifting, handling, and unloading operations are taking place, and
always keep at a safety distance.
Always pre-alert that maneuvers are about to commence.
Do not transit beneath hanging loads.
Do not let yourself be transported together with the loads.
3.3.2 Installation and Hook-up
3.3.2.1 Residual risks present during Installation and Hook-up
There are risks during the installation and hook-up phases tied to:
operations on the
PARTLY COMPLETED MACHINERY
contact with elements under voltage;
collision or crushing by components of the
tripping or falling near electrical power connections;
damage of the
PARTLY COMPLETED MACHINERY
3.3.2.2 Necessary Individual Protection Devices
3.3.2.3 Included warning signs
The
PARTLY COMPLETED MACHINERY
concerning Safety.
3.3.2.4 Cautions to be followed during Installation and Hook-up
During the installation and hook-up phases, the cautions described in this paragraph must be followed.
Follow the indications relative to safety reported in Paragraph 3.3.1 - Lifting and Transport during the necessary handling
operations on the
PARTLY COMPLETED MACHINERY
Use the auxiliary equipment and, at any rate, any other machinery or tool (electrical or pneumatic) only after having understood
the indications reported in the relative Use and Maintenance Manuals, or after having undergone specific and formal training.
Protect the piping of the connections to the energy sources with rigid sheaths or adequate wire feed-thru conduits.
Perform the required interventions using work tools up to norm (ladders, various tools) and paying utmost attention to elements
that could lead to tripping or cause cuts and contusions.
3.3.3 Maintenance and Demolition
3.3.3.1 Residual risks present during Maintenance and Demolition
There are risks during the maintenance and demolition phases tied to:
operations on the
PARTLY COMPLETED MACHINERY
collision and crushing by components of the
contact with hot elements of the
contact with refrigerant fluid.
3.3.3.2 Necessary Individual Protection Devices
3.3.3.3 Included warning signs
The
PARTLY COMPLETED MACHINERY
concerning Safety.
3.3.3.4 Cautions to be followed during Maintenance and Demolition
During the maintenance and demolition phases, the cautions described in this paragraph must be followed.
Perform the required interventions using work instruments up to norm (ladders, various tools) and always wearing the necessary
IPD.
The maintenance and demolition interventions must be performed by qualified and specifically trained personnel.
Check that the power supplies have been duly disconnected and that no one can reactivate them before the required
interventions are concluded (need to act on the main on/off switch, supplied as a separate optional feature, of each fan motor;
alternatively, disconnect the entire unit from the line provided by the customer); moreover, check that any possible residual
energy has been de-charged before performing the interventions.
As much as possible, operate on the
proceeding to restart it, make sure the system is thoroughly cleaned.
Obtain the necessary work permits and check that all the procedures to arrange the
operations have been performed correctly.
by unqualified, untrained, uninformed, or improperly equipped personnel.
PARTLY COMPLETED MACHINERY
during the installation and hook-up phases.
is equipped with specific danger and prohibition signs; in this respect, see Paragraph 3.4 - Signs
.
by unqualified, untrained, uninformed, or improperly equipped personnel.
PARTLY COMPLETED MACHINERY
PARTLY COMPLETED MACHINERY
is equipped with specific danger and prohibition signs; in this respect, see Paragraph 3.4 - Signs
PARTLY COMPLETED MACHINERY
PARTLY COMPLETED MACHINERY
being handled;
being handled;
or of the relative equipment;
and on the piping only after having emptied them and, before
PARTLY COMPLETED MACHINERY
by grabbing it by its non-structural
for maintenance
RC-RCS Pag - 38 - REV 02 03/16