Télécharger Imprimer la page

Parker Hyperchill Plus-E Manuel D'utilisation page 40

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 63
5.3 Preventive Maintenance Programme
To guarantee lasting maximum chiller effi ciency and reliability:
Maintenance
Activity Description
Activity
Check
Service
Check POWER ON indicator is lit.
Check control panel indicators
Clean condenser fi ns.
Check electrical absorption
Check refrigerant leaks
Clean safety valve (if present)
Check temperature sensors
Replace if necessary
Maintenance kit
Z
The following are available (see par 7.):
a) service kit:
• electrical kit;
• compressor kit;
• fan kit;
• expansion valve kit;
• evaporator kit;
• pump kit
• water tank kit;
b) individual spare parts.
English
5.4 Dismantling
The refrigerant and the lubricating oil contained in the circuit must be recovered in conformity with
current local environmental regulations.
Maintenance Interval
The refrigerant fl uid is recovered before fi nal scrapping of the equipment ((EU) No. 517/2014 art.8).
(standard operating conditions)
frame and panels
tank
pipes/collectors
pipe insulation
compressor
condensator
pump
fan
refrigerant
valve
electrical cable
Equipment containing electrical components must be disposed separately
collected with electrical and electronic waste according to local and currently
legislation.
ICEP008E-ICEP027E
%
Recycling Disposal
steel/epoxy resin polyester
aluminium/copper/steel
copper/aluminium/carbon steel
NBR rubber
steel/copper/aluminium/oil
steel/copper/aluminium
steel/cast iron/brass
aluminium
R513A
brass/copper
copper/PVC
Z
18/20

Publicité

loading

Ce manuel est également adapté pour:

Icep-eIcep 008eIcep 011eIcep 015eIcep 022eIcep 027e