Télécharger Imprimer la page

Fulgor Milano F7SRC36S1 Notice D'installation page 18

Masquer les pouces Voir aussi pour F7SRC36S1:

Publicité

Les langues disponibles

Les langues disponibles

3. PREPARING THE INSTALLATION
EN
TOP COMPRESSORS UNIT:
Electrical connection
fig.2 Back of appliance
Operate as follows:
>
Unwind the electric cable and connect it directly to
the wall socket.
>
Make sure the appliance is in the Stand-by condition
and that all ights are off; should it be not so press the
Unit button
to switch it off.
1
fig.3 Front of appliance
>
Firmly tighten with fingers - a tool / wrench should
not be needed to make a proper seal. Turn on the
water and ensure all connections are not leaking
prior to pushing the unit into the opening.
3.4 Leveling
Adjust the appliance level by means of the front
levelling feet and the rear adjustable wheels.
2
1
18
Water connection
2
1
Operate as follows:
>
If necessary, remove the bottom plinth or grille
(it is kept in position by magnets), adjust the
height of the levelling feet
mm (11/16") wrench.
>
Then adjust the height of the rear wheels by
turning the front adjusting bolts
(raise) or counter-clockwise (lower) as it may be
required.
Take care if using a power driver for this and
lower the clutch to prevent damaging the leveling
mechanism.
>
Remount the bottom plinth or grille.
[ 1 ]
by means of a 17
[ 2 ]
clockwise

Publicité

loading