Télécharger Imprimer la page

Checchi & Magli WOLF Manuel D'installation Et D'entretien page 64

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Maintenance advice
Maintenance work must be carried out with the work
vehicle on flat, compact ground, with the tractor en-
gine off, parking brake engaged, and ignition key re-
moved, and adopting all the necessary safety meas-
ures required to work safely.
Maintenance schedule
To guarantee constant, efficient and safe machine operation, ensure all the maintenance envisaged by the manufac-
turer is carried out.
Maintenance schedule
Frequency
Component
Dispencer
Every hour
Drilling cups
Lift frame
Every day
Safety devices
Warning and hazard plates
Machine components
Every 50 hours
Nuts and bolts
Every 150 hours
Tyres
English language
MAINTENANCE INFORMATION
Any maintenance operations that can be carried out
on the business premises come under the ordinary
maintenance envisaged in the instruction manual.
Special maintenance operations require a special-
ised workshop on the premises which meets the
requirements specified by the relative laws in force
(appropriate equipment suitably trained staff etc.);
if you do not have a compliant workshop, contact an
authorised one.
Type of work
Cleaning
Cleaning
Inspection
Inspection
Inspection
Greasing
Tightening inspection
Pressure check
27
Manual reference
Drilling cup cleaning
Pressure check
Use and maintenance
7

Publicité

loading

Ce manuel est également adapté pour:

Wolf/1Wolf/2Wolf/3Wolf/4Wolf/5Wolf/6