Télécharger Imprimer la page

Cub Cadet XR2-1000 Manuel D'utilisation page 38

Publicité

Les langues disponibles

Les langues disponibles

Power
Up
Install and connect the Base Station
Place the Base Station in its planned location and
align its center on the perimeter wire.
In case of External
Installation, the Base
Station should be placed in
a small shift to the right,
in order to allow smooth
entry of the mower to the
Base Station.
38

Publicité

loading

Ce manuel est également adapté pour:

Xr2-1500Xr2-2000