Vermeiren Pratic Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Below the cross bar of the head slatted frame there is a socket for attaching the relief unit (Fig. 8).
1
4
Insert the power cable relief unit (4) into its intended holder(3).
Pull the desired length of power cable (1) so that the power cable (2) can be laid under the slatted
frame without sagging. Be careful to avoid having the cable (2) come under the traction in any
adjustment position.
Fasten the power cable by properly tightening the power cable relief unit(4).
Fix the position of the relief unit by manually tightening the screw joints (5).
2
5
3
14
1 = Power cable
(power connection)
2 = Power cable
(Transformer
connection)
3 = Holder
Strain relief
4 = Strain relief
Power cables
5 = Screw joint
Strain relief
EN
PRATIC
2010-11

Publicité

Table des Matières
loading

Table des Matières