Inspection And Maintenance Schedule; Demolition And Disposal - Palazzetti ECOFIRE GIORGIA Notice D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour ECOFIRE GIORGIA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Burn pot
Ash drawer/compartment
Glass
Fan grille
Boiler
Resistance sleeve
Fume manifold
Door seals and burn pot*
Smoke exhaust duct*
Fans*
To be performed by a qualified technical support centre.
(*)
At least once a year or every 40 quintals of burnt pellets.
(a)

14 DEMOLITION AND DISPOSAL

The responsibility for the demolition and disposal of the stove is the exclusive responsibility of the owner who
must act in compliance with the laws on safety, respect and protection of the environment, in force in the
country where the fireplace is installed.
Decommissioning and disposal can be entrusted to a third party, provided to always use companies authorised
for recovery and elimination of the materials in question.
INDICATION: always and in any case respect the regulations in force in the country where the
fireplace is installed for the disposal of materials and possibly for the disposal report.
All disassembly operations for the demolition must take place when the fireplace is off and the
power supply disconnected:
remove the entire electric system;
separate the accumulators in the electronic cards;
the demolition of the stove's structure is to be carried out by authorised companies.
Dumping of the stove in accessible areas poses a serious risk for persons and animals:
Any liability for damage to people and animals always falls on the owner.
At the time of demolition, the CE marking, this manual and any other documents relating
to this fireplace should be destroyed.
004778270 - 24/07/2020
ITALIANO
ENGLISH

INSPECTION AND MAINTENANCE SCHEDULE

EACH
IGNITION
X
DEUTSCH
EACH
1
WEEK
MONTH
MONTHS
X
X
X
X
X
FRANÇAIS
ESPAÑOL
3
1
YEAR
(a)
X
X
X
X
35

Publicité

Table des Matières
loading

Table des Matières