Tools Required; Taking Delivery Of The Equipment; Outils À Prévoir; Prendre La Livraison De L'équipement - Stuv 16 Z Serie Installation, Mode D'emploi, Entretien

Masquer les pouces Voir aussi pour 16 Z Serie:
Table des Matières

Publicité

5.2 Tools required

Allen Key - Clé Allen 2.5-3
T10 - T20 - T25
7-8-13-15
7-8-10-13
5.3 Upon taking delivery of the
equipment
Please note !
As soon as the stove is delivered, please check that
the glass has not been broken during delivery. The
warranty only covers damage due to transport if it is
reported within 48 hours of delivery and if it is indicated
on the delivery slip.
Complaints
26
If you wish to make a complaint, always supply the serial
number visible on the fireplace [diagram 1].
STÛV WOOD-BURNING FIREPLACE INSTALLATION / STÛV INSTALLATION POÊLES À BOIS
PH2
5.2 Outils à prévoir
5.3 Prendre la livraison de l'équipement
Attention!
Dès la réception de ce foyer, veuillez vérifier que les
vitres ne se soient pas brisées au cours de la livraison.
En effet, la garantie ne couvre les détériorations dues au
transport que si elles ont été signalées dans les 48 heures
suivant la réception et qu'elles aient été mentionnées sur
le bon de livraison.
Réclamation
En cas de réclamation, communiquez toujours le n° de
série visible sur foyer [diagramme 1].
xxxx
xxxx
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

16-58 z16-68 z16-78 z16-z seire

Table des Matières