Putting Into Operation; Safety Notes; Operation And Function - Burkert 0258 Instructions De Service

Vanne de régulation motorisée modulaire à 2 et 3 voies
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com

PUTTING INTO OPERATION

Safety notes

ATTENTION!
ASSEMBLY
NOTE
You can install the motor control valve in any position, but preferably with
the drive at the top.
Single blocks are secured with tie rods or angle brackets, and dual and quad
blocks with angle brackets.

OPERATION AND FUNCTION

Safety notes
ATTENTION!
16 - 0258
Before putting the motorised control valve into operation,
ensure that
the electrical power supply corresponds to the voltage
quoted on the rating plate,
the electrical connections have been carried out as
described in the TECHNICAL DATA chapter.
the motorised regulating valve is only used in its original
configuration and must not be dismantled,
all hoses are securely connected to the hose
connections. Danger of scalding!
If connection sizes or angled connections other than those set
up in the factory are required, the valve must be converted by
the factory. This also applies to changes to the serial
connection of the modules.
Observe the following during operation
compliance with the general technical rules!
the valid accident prevention and safety regulations for
electrical device.

Publicité

Table des Matières
loading

Table des Matières