Measures to be taken before putting into service

Check all connections, voltages and the operational pressure!
Ensure that the max. operational conditions (see rating plate) will not be exceeded!
Check that Ports 1, 3 and 5 are correctly connected according to the regulations. These connections
must not be interchanged for any reason!
When operating electrically, unlock the manual override!
Faults
Fault
Possible cause
Valve does not
Operational voltage too low or
switch:
not present;
Manual override not in neutral
position;
Compressed air supply not
available or insufficient
Valves switch
Compressed air supply not
with a delay, or
available or insufficient;
exhaust
through the
venting ports:
Valves are not in the starting
position (whitout current)
during pressure build-up
Insufficient venting of the
exhaust channels due to
silencers that are too small or
are soiled (backpressure);
Impurities or foreign matter in
the pilot valve or main valve.
Leaking valve
O-rings between the modules
block:
missing or damaged;
Missing or incorrectly
positioned profile gaskets
between the valve and the
baseplate.
16 - 6516 / 6517
S
ERVICE
Correction
Check the electrical supply connections.
Ensure that the electrical power supply is the same as
that specified on the rating plate.
Set the manual override to the zero position.
Carry out the dimensioning of the compressed air
connection with volumes as large as possible (including
that of upstream pressure regulators, service units, cut-
off valves etc.)
Minimum operational pressure≥ 2 bar
Carry out the dimensioning of the compressed air
connection with volumes as large as possible (including
that of upstream pressure regulators, service units, cut-
off valves etc.)
Minimum operational pressure≥ 2 bar
Appley pressure to the valve block before you switch the
valves
Use silencers or expansion channels with sufficient
dimensions.
Clean soiled silencers.
Blast through the exhaust channels with pulsed
compressed air, to blow out impurities. Install a new pilot
or main valve if these measures bring no improvement.
Check for leaks and for missing seals.
Install the missing seals and replace damaged seals.