Pnp Installation; Installing A Receiver; Battery Selection And Installation - PARKZONE Stinson Reliant SR-10 BNF Manuel D'utilisation

Masquer les pouces Voir aussi pour Stinson Reliant SR-10 BNF:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PNP Installation

Stinson Reliant. Damage to these parts can result from aircraft
crashes. Installation of the motor is in reverse order of the
steps listed below. The propeller (PKZ1012) must be removed
removed from the aircraft.
could result.
1. Remove three (3) screws from the cowl.
2. Carefully remove the cowl from the fuselage.
Range Check and Pre-Flying Tips
wire connectors (wire colors are aligned between the motor
5. Remove four (4) screws from the motor mount and motor

Installing a Receiver

1. Install your park flyer or full range receiver in the
fuselage using hook and loop tape or double-sided servo
tape.
2. Attach the elevator and rudder servo connectors to the
appropriate channels of the receiver.
All manuals and user guides at all-guides.com
ONLY
3. Remove four (4) screws from the motor mount (PKZ4428) and
the fuselage.
the receiver.
receiver.

Battery Selection and Installation

We recommend the ParkZone 1800mAh 11.1V 15C
Li-Po battery (PKZ1029).
If using another battery, the battery must be at least a
15C 1800mAh battery.
capacity, dimensions and weight as the ParkZone
Li-Po battery to fit in the fuselage without changing
the center of gravity a large amount.
EN
17

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Stinson reliant sr-10 pnp

Table des Matières