General Assembly And Maintenance Tips; First Flight Preparation; Maintenance After Flying - PARKZONE Stinson Reliant SR-10 BNF Manuel D'utilisation

Masquer les pouces Voir aussi pour Stinson Reliant SR-10 BNF:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN

General Assembly and Maintenance Tips

strongly suggest reading through this manual completely before proceeding.

First Flight Preparation

Remove and inspect contents
Begin charging flight battery
Assemble Stinson Reliant
Install receiver
Install fully charged battery
Bind the receiver to a transmitter, if applicable
Perform the Control Direction Test with the transmitter
Adjust flight controls and transmitter
Perform a radio system Range Check

Maintenance After Flying

Turn off transmitter (Required for Safety)
Remove flight battery from aircraft
Recharge flight battery
Clean aircraft (wipe off dirt, etc.)
Repair or replace all damaged parts
Carefully disassemble and store aircraft
Store flight battery apart from aircraft and monitor the battery charge
Make note of flight conditions and flight plan results, planning for future flights
Installing Pushrods on Control Horns
on the pushrod. Make sure transmitter trims are
centered before making this adjustment.
pushrod.
pin in a selected hole in the control horn.
the control horn.
All manuals and user guides at all-guides.com
Activity
see page 9
Activity
(Required for Safety)
1.
2.
3.
PNP
PNP
4.
5.
6.
BNF
BNF

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Stinson reliant sr-10 pnp

Table des Matières