Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 108

7.4 Rack installation

-
Release the gearmotor (see OPERATING INSTRUCTIONS) and open the gate.
-
Place the rack against the pinion and sliding the gate manually fix it along its whole length.
NB: To make it easier to align the rods correctly, use a scrap piece of rack and rest it underneath
the junction point, as shown in the figure detail.
-
Once fixed, vertically adjust the gearmotor to give a play of about 2 to 3 mm between the pinion
and the rack.
-
Secure the gearmotor with the [B] screws using a tightening torque of 20-25 Nm.
-
Slightly lubricate the rack and pinion after assembly.
Manually check that the gate slides evenly and without friction.
11
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ditec ion6Ditec ion4jDitec ion6j

Table des Matières