Pre-Installation - entrematic Ditec DAB805PLAT Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4

1. Pre-installation

Use the three levels arm for inswing doors (seen from automation side).
• Prepare to fasten the automation to the wall in accordance with the measurements shown in the diagram by referring to the hinge axis.
• Drill holes in the wing in line with where the arm is fastened.
• If necessary, use the DAB805SE2/SE5/SE7 extensions to increase measurement X between the automation and the arm fixing points.
2. Fastening the automation
For the installation of the automation, refer to chapter 8 of the DAB105 installation manual.
3. Fastening the arm
• With the door closed, fasten the arm to the automation in the arm support housing [C].
• Fasten the bracket [A] to the wing to form an angle of 80-90°. Fix and regulate the arm [B]. If necessary remove the arm [B].
• Manually move the door and check that it opens and closes correctly without friction.
30
210
90
C B
400
3.1 Assembling the right three levels arm.
• For automations with right-hand opening, assembly of the DAB805PLAT arm must be inverted as shown in the figure.
i
For further information, refer to the DAB105 installation manual.
A
~90°
B
30
210
C
A
230
A
3
90
~90°

Publicité

Table des Matières
loading

Table des Matières