When refrigerant recovery is difficult due to the large amount of refrigerant
1 Prepare manifold gauge, scale and an empty refrigerant vessel.
2 As shown below, connect the middle hose of manifold gauge to the refrigerant vessel and then connect the both
ends of manifold gauge to the outdoor unit service valve individually.
( Valve of refrigerant vessel and Low pressure side valve must be closed and the high pressure side valve
must be open.)
3 Start refrigerant recovery operation by pressing K2 button three times. (Refer to page 36.)
4 After operating for 10 minutes, open the valve of refrigerant vessel and fill it with refrigerant.
5 Close the valve of refrigerant vessel when sufficient refrigerant is filled.
6 Close the liquid service valve immediately. When the low pressure falls down lower than 0, close the gas service
valve.
7 Stop the operation by pressing reset button.
• 4.4/6.6kW
Manifold gauge
Low pressure
side
Liquid pipe
Gas pipe
for hydro
Not in use
(Gas pipe for Air)
• 9/12/16kW
High pressure
side
An empty
refrigerant
vessel
scale
Liquid pipe
Manifold gauge
Low pressure
side
Gas pipe
for hydro
High pressure
side
An empty
refrigerant
vessel
scale
Not in use (Gas pipe for Air)
English
43