Locating the Units
Combinations (Outdoor / indoor units)
Cooling
Outdoor unit
capacity
connections for indoor units
(kW)
(Not including Hydro-A2W)
AE044MXTPEH
4.4
AE066MXTPEH
6.6
AE090MXTPEH
9
AE120MXTPEH
12.1
AE160MXTPEH
15.4
AE090MXTPGH
9
AE120MXTPGH
12.1
AE160MXTPGH
15.4
• Available for max 7 indoor units.
• When considering the system capacity of allowable
indoor units, follow the table above.
Tools Required for Installation
General Tools
• Vacuum Pump (Backward flowing prevention)
• Manifold Gauge
• Stud Finder
• Torque Wrench
• Pipe Cutter
• Reamer
• Pipe Bender
• Spirit Level
• Screw Driver
• Spanner
• Drill
• L Wrench
• Measuring Tape
Tools for test operations
• Thermometer
• Resistance Meter
• Electroscope
12
English
Maximum allowable
Total capacity of
connected indoor
units (kW)
2
2.2~4.4
3
3.3~6.6
4
4.5~9.0
5
6.0~12.1
7
7.7~15.4
4
4.5~9.0
5
6.0~12.1
7
7.7~15.4
Moving the Outdoor Unit
• Select the moving route.
• Secure the strength of the carrying path to resist
against the weight of the outdoor unit.
• Do not slant the product more than 30˚ when carrying
it. (Do not lay the product down sideways.)
• The surface of the heat exchanger is sharp. Be careful
not to be get injury while moving.
When moving with a crane or straps
• In case of placing the outdoor unit on a high ground
such as rooftop
– Fasten the wire rope as seen in the picture.
– Move the product with its package on, to prevent
any damages caused by the rope.
When moving by installation personnel
• When the moving distance of the product is close
enough for installation personnel to carry.
– 2 people should move the product using the carry
handle as shown in the picture.
– Be careful not to damage the heat exchanger.
– Be careful not to get injured by the sharp edge of
the heat exchanger.
Wire rope/straps
Wood palette