Samsung AE044MXTPEH Mode D'emploi page 21

Masquer les pouces Voir aussi pour AE044MXTPEH:
Table des Matières

Publicité

Installing the Y-Joint
Install the Y-joint 'horizontally' or 'vertically' .
• Install horizontally
• Install vertically
CAUTION
• Make certain of a minimum distance in straight
line.
Rear
Pipe in use
Rear
on the site
Gas/Liquid side Y-joint
Front
To outdoor unit
Maintain ±15° start
from the horizontal line
• Install the Y-joint within ±15°
from the horizontal or vertical line.
To other branching
pipe or indoor unit
Pipe in use on the site
Socket
500mm
Main pipe
or more
Connecting the Outdoor Unit Pipe
• Install pipe work within maximum allowable length,
height and length after branching.
• Make sure there are no cracks on pipe bends.
• Make Sure where the Gas side for Hydro and Air
→ Check the Mark "hydro" and "air"
※ Hydro : A2W Hydro unit
Air : A2A Indoor unit
4.4/6.6kW Outdoor unit
9/12/16kW Outdoor unit
Liquid side
Liquid side
Gas side for hydro
Gas side for air
Gas side
for hydro
Gas side
for air
21
English

Publicité

Table des Matières
loading

Table des Matières