3
Installation
3.1
General information
The chamber elements are put together in accordance with Fig. [1]. Please heed the following:
–
The excavation pit must have been prepared.
–
Check chamber depth. Make sure that the assembled chamber elements correspond to the depth of the
excavation pit.
–
Keep chamber elements and sealing gaskets free of soiling.
–
The chamber elements must be assembled from the bottom up.
–
The chamber system has been designed for a maximum of 0.5 m water pressure. -
010-657
Installation
32 /96
2017/11