Installation - Kessel Aqualift F XL Manuel D'instructions Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30
4

Installation

4.1
How it works
Normal installation depth
Minimum installation depth
4.2
General installation information
A residual current circuit breaker must be provided as electrical protection for the system.
The system's control unit must be positioned in such a way as to prevent any unauthorised use.
Consequential damage can occur in the building if the system is switched off accidentally.
Assembly sequence
The system is installed and put into operation at different times according to the usual construction phases on a building site.
Installation of the system tank (base section of the chamber system) in the chamber.
Connection of wastewater inlet and outlet, as well as connection of the pressure pipe via which the wastewater is
pumped off.
Installation of the chamber system, starting from the system tank (not described in these instructions).
Installation of the delivered assemblies, starting with chapter 4.3.
22 / 88
Pumping station / Installation and operating instructions
010-695_02

Publicité

Table des Matières
loading

Table des Matières