Connecting The Pipework System For Lw 800 / Lw 1000 - Kessel LW 400 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.9.2

Connecting the pipework system for LW 800 / LW 1000

Establish connections as follows: Inflow <30> Outflow <31>
The closed base (e.g. for the closed channel) is not suitable for installation in the groundwater without having
been reinforced in the factory first since the deformation resistance can become loose otherwise.
When the chamber is used as a backwater chamber, DIN EN 12056 must always be heeded when routing the
base pipe. In addition, a stilling section must be observed upstream and downstream of the backwater valve (at
least 1m).
LW 800
010-657
Fig. [12]
Installation
38 /96
Fig. [13]
2017/11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lw 800Lw 1000

Table des Matières