Installation - Kessel Aqualift F Basic Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Installation

5.1
Soil excavation and placement of the system
Ensure suitability of product (variant) for environmental
conditions (see "Intended use", page 53) and installation
depth (see "Product description", page 56).
Determine embankment gradient (ca. 60°).
Excavate installation pit. In doing so, ensure that there is
a footing of at least 50 cm around the base.
Compact the installation pit with a 30 cm clean layer and
level out flat.
64 / 144
Pumping station / Installation and operating manual
016-102_01 DE_EN_FR

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Stf 1300

Table des Matières