3.9.3
Connecting the pipework system for LW 800 / LW 1000
•
Establish connections as follows: Inflow <30> Outflow <31>
•
The closed base (e.g. for the closed channel) is not suitable for installation in the groundwater without having
been reinforced in the factory first since the deformation resistance can become loose otherwise.
When the chamber is used as a backwater chamber, DIN EN 12056 must always be heeded when routing the
base pipe. In addition, a stilling section must be observed upstream and downstream of the backwater valve (at
least 1m).
LW 1000
2017/11
Fig. [14]
Installation
39 / 96
Fig. [15]
010-657