Operation; Programms - probst HVZ-ECO Instructions D'emploi

Pince hydraulique pour pavés
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

Operating the HVZ-ECO with an excavator:
Make yourself familiar with the operating elements for the both hydraulic circuits (main / side gripping direction).
Especially remind the function for opening the main gripping direction, that there is no accidental opening while the
installation clamp is lifted up and the layer falls down.
DANGER OF ACCIDENTS!
Activate the control lever as possible at idling speed of the support frame.
Move the operating lever almost at idling speed, because the great hydraulic flows of big excavators can cause
malfunctions or even damages of the HVZ-ECO.
7.1.1

Programms

In this program version the following programs are stored:
Program 1: „Standard program", for the laying of stone layers, which were be displaced from a so-called
„cross joint pattern" in a running bond, as soon as layers of stones, which shall be compressed and layed
from 4 sides.
51400034
V3
31 / 41
GB

Publicité

Table des Matières
loading

Table des Matières