Operation
5
Operation
5.1
Loads on firm ground
1. Move the VTK-V carefully to the load.
4. Take the VTK-V by the handles , bring
it in horizontal position and carefully
transport the load to place of
destination.
7. The VTK-V can now be moved away.
51100015
2. Bring the stop and the bottom plate
in position by placing the VTK-V in the
upright position.
5. At place of destination, bring the
VTK-V carefully in the upright position.
13 / 16
3. Engage the lever up to the stop
clockwise, so the load is getting
clamped.
6. Rotate the lever counterclockwise to
release the load.
GB