Cisco Aironet 1300 Serie Instructions De Montage page 19

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Figure 5
Figure 5
Step 7
Point the antenna as accurately as possible in the direction of the remote antenna. The integrated antenna
is correctly positioned when the flat face of the radome faces the remote antenna.
Routing the Cables
This procedure explains how to route the power injector cables from the access point to a grounding
block. The grounding block should be installed at the building entry point.
To route and connect cables, follow these steps:
Step 1
Unspool two 75-ohm cables the full length from the access point to the grounding block, laying them
out straight without kinks. Do not cut the cables until you know the total required length between the
access point and grounding block.
Install F-connectors on the access point end of each cable and connect the cables to the access point. For
Step 2
outdoor locations, the cables should slope downward from the access point connectors so that moisture
runs away from the access point during rainstorms. If necessary, form drip loops near the connectors.
Dress the cables along the path from the access point to the grounding block. Secure the cables as you
Step 3
go using UV-stabilized Ty-Wraps or equivalent fasteners.
78-17634-01B0
shows the access point mounted on the rooftop mast:
Roof-Mount Assembly
1 5
0
1 5
I S
T H
E
S I D
U P
Cisco Aironet 1300 Series Lightweight Outdoor Access Point Mounting Instructions
Mounting the Access Point
19

Publicité

Chapitres

Table des Matières
loading

Table des Matières