E N
S E R V I C E
Service
GENERAL
All maintenance activities must happen at an disconnected machine and hoses
without pressure. Checking the electric components can happen exclusively by
an expert. Exclusively accessories and replacement components which have
been approved by the manufacturer can be used. Directly after the activities all
securities- and protection parts must be assembled, before the machine is put
into functioning. "a golden rule" that contributes to a perfectly working machine
with few problems, is well the following:
A daily control and cleaning of the machine frequently do wonders!
To be able to guarantee a perfectly working system, one has first necessary a
reliable and technical well considered machine, which is then faced secondly
at regular times with a thorough maintenance. Therefore the experience and
the "know-how" of DiBO a technical good working machine is insured and large
maintenance turns can be carried out by experienced DiBO technicians by
means of appointment or maintenance contract, we can suppose in advance
that it is satisfied to these two points.
MAINTENANCE DIAGRAM
1
General
The user can carry out only those actions for which in this book authorisation
are given. Each other act has been prohibited! For the maintenance turns of
burner kettle, high pressure pump, combustion engines and of components
which have to do with the security, one must contact our DiBO technicians.
Open the hood (cap) only for service purposes (example: at engine) using the 2
start buttons (see photo) at the bottom and at the front of the machine.
2
Periodic maintenance
DISCRIPTION
Control of the electric cables,
high and low pressure hoses and
coupling and control of the oil level.
Refreshing pump oil.
Replace the bypass valve(s).
Refreshing reduction gearbox oil.
Cleaning water filter.
All following refreshments of pump
oil / reduction gearbox oil.
Maintenance engine (oil replace).
Clean air filter/exhaust. Replace oil
filter/spark plug(s).
See also added motor manual for all
other maintenance items which need
to happen.
Extra control/replacement of joints,
valves, o- rings by acknowledged
DiBO- technicians!
DiBO 26
PERIODE
After each use.
First 50 hours.
Each 250 hours
First 50 hours.
Each 50 hours/each month.
Each 400 hours/yearly.
First 5 hours & next 50 hours.
Yearly
Pay attention, shorter maintenance
intervention necessary to the motor!
Each 600 hours