Electrical Connection; General Information - Bitzer ORBIT 6 GSD60120 Instructions De Service

Compresseurs à scroll hermétiques
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

mm
G.60120VAB ..
557
G.60182VAB
G.60235VAB
564
Connection positions
4
Sight glass
5
Oil service connection (Schrader) / Connec-
tion for oil equalisation (parallel operation)
7
Mounting position for vibration damper
8
Mounting position for tandem and trio fixing
rails
10
Economiser connection (7/16 - 20 UNF, 1/4
(3/8 outer diameter)) - ORBIT FIT only
SL
Suction gas line
DL
Discharge gas line
Mount the discharge gas temperature sensor on the
discharge nozzle. Secure with clamp and insulate.
12
A
B
inch
mm
inch
21.91
520
20.47
22.19
526
20.71

5 Electrical connection

5.1 General information

General information
Compressors and electrical equipment comply with the
EU Low Voltage Directives 2006/95/EC and 2014/35/
EU.
Connect mains cables, protective earth conductors and
bridges (if needed) as specified on the labels in the ter-
minal box. Observe the safety standards EN 60204,
IEC 60364 and national safety regulations.
NOTICE
!
!
Risk of short-circuit due to condensation water
in the terminal box!
Use cable bushings which meet protection class
IP54 and pay attention to proper sealing when
mounting.
Form a drip loop at the entering cables.
NOTICE
!
!
Risk of motor damage!
Improper electrical connection or compressor
operation at incorrect voltage or frequency may
lead to motor overload.
Observe the specifications on the name plate.
Connect properly and check the connections for
tight fitting.
Recommended tightening torques:
ORBIT 6
• Terminals: 2.4 - 2.8 Nm (M5)
• Grounding: 4.5 - 5.1 Nm (M8)
ORBIT 8
• Terminals L1, L2, L3: 4.5 - 5.1 Nm (M6)
• Grounding: 4.5 - 5.1 Nm (M8)
ESB-130-7

Publicité

Table des Matières
loading

Table des Matières