Final Assembly (Qualified Specialist) - Speck pumpen BADU Jet Wave Traduction Des Instructions D'utilisation D'origine

Wg23.70.060-p
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 118
Installation
5.3

Final assembly (Qualified specialist)

WARNING
Injury due to suction if the suction panel is not mounted!
Mount the suction panel.
All guarantee rights and claims for compensation are rendered
invalid for damage resulting from the suction panel not being
mounted or being mounting incorrectly.
NOTICE
Only tighten the screws hand-tight. Do not use any force!
After the installation of the main housing (pre-assembly kit):
1.
Glue in the cable protection hose and the hose for air supply.
(Fig. 15)
2.
Position the nozzle housing (102.1) on the main housing (1).
3.
Lead the pneumatic hoses (47) and floodlight cables through
the protective conduit (14) and seal with the cable gland (20).
4.
Attach the air pipe to the air regulator (21), assembled on
site, with a clamp (8).
5.
Attach the nozzle housing (102.1) to the main housing (1)
with 4 tapping screws (95). (Fig. 16)
6.
Lead the pneumatic hoses through the openings in the cover
(93) and fasten them to the corresponding buttons with hose
clamps (46); Light ON/OFF left; Pump ON/OFF right. (Fig.
17)
7.
Fasten the cover (93) to the nozzle housing with the four
scews (113). Insert the two pneumatic buttons through the
light cover (110) in the nozzle housing and lock by turning it
clockwise. (Fig. 18)
8.
Secure the cover for the air regulator. (Fig. 19)
9.
Connect the jet pump (92) to the main housing (1) on the
suction and pressure sides using the half screw (98, 99,
100), the rubber bracket (79) and the corresponding clamps
(75).
10. Connect the pump motor according to the wiring diagram.
Pay attention to the correct direction of rotation for
three-phase motors! Only carry out the direction of
30 EN
01|2018

Publicité

Table des Matières
loading

Table des Matières