Speck pumpen BADU Jet Wave Traduction Des Instructions D'utilisation D'origine page 64

Wg23.70.060-p
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 118
Table of contents
3.2
Function .................................................................................. 15
4
Transport and intermediate storage ............................................. 16
4.1
Transport ................................................................................. 16
4.2
Lifting the pump ....................................................................... 16
4.3
Storage ................................................................................... 17
4.4
Returns ................................................................................... 17
5
Installation ...................................................................................... 18
5.1
Installation site (Qualified specialist) ....................................... 18
5.1.1
Outdoor installation ............................................................. 18
5.1.2
Installation position .............................................................. 18
5.1.3
There must be ground drainage .......................................... 18
5.1.4
Ventilation and aeration ....................................................... 18
5.1.5
5.1.6
Reserve space .................................................................... 19
5.1.7
Fasteners ............................................................................ 19
5.2
Installation (Qualified specialist) .............................................. 20
5.2.1
Installation tip concrete pool ................................................ 20
5.2.2
Installation tip foil/polyester pools ........................................ 24
5.2.3
Aligning the support ring ...................................................... 28
5.2.4
5.2.5
Pipe sizing ........................................................................... 28
5.2.6
Laying pipes ........................................................................ 29
5.2.7
Pump shaft .......................................................................... 29
5.2.8
Electrical control unit ........................................................... 29
5.3
Final assembly (Qualified specialist) ....................................... 30
5.3.1
Installation example ............................................................. 34
5.3.2
5.4
Electrical connection (Qualified specialist) .............................. 35
5.4.1
Counter swim unit electrical connection .............................. 36
5.4.2
Wiring diagram 3-phase 400/230V 50 Hz ............................ 37
5.4.3
Wiring diagram 1-phase 230V 50 Hz ................................... 37
5.5
5.5.1
Benefits ............................................................................... 39
5.5.2
5.5.3
Dipswitch for time mode settings ......................................... 40
4 EN
01|2018

Publicité

Table des Matières
loading

Table des Matières