5.2.6

Laying pipes

NOTICE
The main housing and the screw connections are made of ABS. A
curing time of at least 12 hours for the bonding must be observed!
Keep the suction and pressure lines as short and straight as
possible.
If possible, lay the suction and pressure lines below the water
level.
Install a shut-off valve in both the suction and pressure lines.
Avoid valves which close suddenly or, if present, close them
slowly.
If the pump is positioned further away, the pipe dimensioning
has to be adapted so that an almost loss-free flow is
ensured.
Use elbows instead of angles.
At a distance of between 5 m and 10 m:
– At 45 m³/h: Suction line d125/Pressure line d125
– At 58 m³/h: Suction line d140/Pressure line d140
– At 75 m³/h: Suction line d160/Pressure line d140
5.2.7

Pump shaft

Store the pump unit in a shaft adjacent to the pool. The
installation room must have proper aeration and ventilation and a
sufficient ground drain. A connection for equipotential bonding has
to exist in the pump shaft. See "Installation example" on page 34.
Please observe the pipe dimensions.
5.2.8

Electrical control unit

The control for the counter swim unit is to be located in a dry
room. Connection of the supply lines and pump is to be carried
out in accordance with the enclosed wiring diagram. The
applicable regulations (VDE) are to be observed. Maximum
distance between pool and control box 10 m!
NOTICE
The control box may only be mounted to the existing holes.
01|2018