2.  The place where machine install 
must be flat and big enough for the 
operation. 
 
 
 
 
 
 
VII  Electric 
 
ELECTRICAL CONNECTION/DISCONNECTION & OPERATION 
 
 
For three phase : 
 
1.  E lectrical connection: 
 
1. A cable with four wires is equipped 
to connect your machine into the 3 
phase power supply. 
 
Please connect your machine into 
the power supply with hand‐
operated disconnecting device, 
which is in compliance with 
subclause 5.3 of EN 60204‐1, such as 
on fuse breaker or plug/socket 
combination. 
 
2. For the protection of control device, 
we recommend the operation to 
a fuse with 6 A current 
supply 
rating of fuse,
between fuse and connection 
terminal shall not exceed 1.5m. 
 
exact power source 
3. The 
voltage, frequency, and 
number of phase 
 and the total length 
shall be checked 
 
Noise Level 
 
1.  The noise level of this machine is 
about 75 db(A)during operation. 
 
2.  While taking provisions for the risk of 
noise, the noise level of working 
environment should be taken into 
consideration also. 
according to the installation diagram 
and circuit diagram. 
 
The correct direction of drilling 
4. 
press should be checked after 
connecting. 
 
2.  E lectrical disconnection: 
 
1. The disconnection is carried out by 
hand‐operated disconnection device. 
 
2. Be sure to disconnect this machining 
from power source, when you want 
to stop the job, Maintenance, and 
adjustment. 
 
3.  G rounding 
 
The grounding of the drilling press is 
carried out 
Yellow/Green terminal of supply 
cable 
to the grounding terminal of 
power source. Be sure to ground your 
machine before connecting machine to 
power source in any situation. 
 
 
13/47 