Parker Service Master CONNECT Manuel D'utilisation page 259

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT
Risk of property damage if the process is stopped.
If the process is stopped, the file system of the device could be dam-
aged.
► Before starting the process, ensure that the battery is charged
to at least 50% or the device is connected to the main power via
the power adapter.
4 Tap on the
Ä The device is reset to the default settings. The process may
take a few minutes.
The Parker Service Master CONNECT V1.2/06/21 EN
button to confirm the process.
Troubleshooting
119

Publicité

Table des Matières
loading

Table des Matières