Getting Started; Checking The Contents Of The Packing Box; Recirculation Cooling Unit Treci (Accessory); Additional Dosing Unit Abtdo (Accessory) - Struers AbraPol-10 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Checking the Contents of the
Packing Box
Recirculation Cooling Unit
TRECI (accessory)
Additional Dosing Unit ABTDO
(accessory)

Placing AbraPol-10

AbraPol-10
Instruction Manual

1. Getting Started

In the packing box you should find the following parts:
1
AbraPol-10 complete
1
Splash ring
1
Drain angle, 90
0
1
Pipe angle connection ø50
1
Pipe angle connection ø32
1
Hose for compressed air
3
Hose clamps
1
Allen key 4 mm
Bottles, ½ l
2
2
Bottle lids
1
Bottle, 1 l
1
Set of Instruction Manuals
1
TRECI complete
1
Drain angle, 45
0
1
Funnel
2
Disposable plastic inserts
Three additional pumps for dosing of OP-Suspension, lubricants
and suspensions.
AbraPol-10 should be placed on a plane and horizontal floor. The
machine must be placed close to the power supply, compressed
air, water mains and water outlet facilities.
3

Publicité

Table des Matières
loading

Table des Matières